Panel upgrades

200-amp panel upgrade in a 1950s ranch

An overloaded 100-amp panel replaced with a properly sized 200-amp service, ready for a future heat pump and EV charger.

Location

Harvey Park

Home

1950s ranch

Time on site

1 day on site

Scope

Panel replacement, grounding update, typed circuit directory

Open residential electrical panel with neatly routed circuits on a workbench

01

The challenge

The original 100-amp panel was full, with doubled-up breakers and a directory that no longer matched the house. The owners were planning a heat pump and an electric vehicle within the next two years.

02

Our approach

We ran a load calculation, coordinated the utility disconnect, and replaced the panel and service in a single day. Grounding and bonding were brought up to current requirements, and every circuit was traced, tested, and relabeled.

03

The outcome

A 200-amp service with room to grow, a typed circuit directory on the door, and a clean, dressed panel interior that’s easy to inspect and service.

On the job

Project photos.

Electrician reaching for the latch of a closed residential electrical panel
Multimeter with test leads on a wooden workbench

Start your project

Planning something similar?

Tell us about your home and what you need. We’ll follow up with questions, next steps, and a written estimate.

Start your project

Planning something similar?

Tell us about your home and what you need. We’ll follow up with questions, next steps, and a written estimate.

Create a free website with Framer, the website builder loved by startups, designers and agencies.